LD Schedule Error message
- sachinvanjara
- Topic Author
- Visitor
10 years 3 weeks ago #16552
by sachinvanjara
LD Schedule Error message was created by sachinvanjara
There is an error while Auto Building LD Scedule.
"PRINCIPAL ZERO ON YYYYMMDD BEFORE MATURITY DATE"
Please guide and advsie how and what to check?
"PRINCIPAL ZERO ON YYYYMMDD BEFORE MATURITY DATE"
Please guide and advsie how and what to check?
Please Log in or Create an account to join the conversation.
- gm.saran
- Offline
- Elite Member
Less
More
- Posts: 203
- Thank you received: 29
10 years 3 weeks ago #16561
by gm.saran
Replied by gm.saran on topic LD Schedule Error message
There has to be a principal repayment on Maturity Date. In your case, the principal becomes zero even before the maturity. Check the P type schedules defined
Please Log in or Create an account to join the conversation.
- sachinvanjara
- Topic Author
- Visitor
10 years 3 weeks ago #16562
by sachinvanjara
Replied by sachinvanjara on topic LD Schedule Error message
Thx for reply...We are crating schedule and providing Principa amount for the Schedule with I tpe schedule as well, This to create schedule automatrically. But Before creating P and I we have Minimum 1 B Schedule type and then P and I is built.
My question is that under what circumstance this would go wrong. i.e. becasue fof Interest rate? or some other information need to be verified.
My question is that under what circumstance this would go wrong. i.e. becasue fof Interest rate? or some other information need to be verified.
Please Log in or Create an account to join the conversation.
- sachinvanjara
- Topic Author
- Visitor
10 years 3 weeks ago #16564
by sachinvanjara
Replied by sachinvanjara on topic LD Schedule Error message
thx for update, the issue has been resolved, as user was keying in wrong amounts.
thankx
thankx
Please Log in or Create an account to join the conversation.
Time to create page: 0.082 seconds